The Design and Build Process Explained

Learn how an integrated team can coordinate design, engineering, permits, budgeting, construction, quality checks, and turnover under one documented project scope.

The Traditional Method

Separate Architect & Separate Builder

In a traditional design-bid-build process, the owner holds separate agreements for design and construction. It can work well, but the owner must manage more handoffs and make sure bidding uses complete, coordinated documents.

Owner coordinates contractsMore team handoffs
Integrated Delivery Approach

Coordinated Design and Construction

An integrated team coordinates architectural plans, engineering documents, permit support, budgeting, and construction execution. The goal is earlier coordination and clearer responsibility; final cost and permitting time still depend on the project and approving authorities.

✓ Coordinated scope✓ Fewer handoff gaps

A Typical Step-by-Step Project Process

From initial requirements to drawings, approvals, construction coordination, inspection, and turnover.

01

Consultation & Budget Alignment

The owner and project team document the site, intended use, priorities, target budget, and constraints before design begins. These assumptions should be tested as drawings and site information develop.

02

Schematic Architectural & Structural Engineering

The appropriate registered and licensed professionals prepare and sign the architectural and engineering documents required for the project. The exact disciplines and studies depend on the building and site.

03

Permitting, Zoning & HOA Assistance

The project team assembles the applicable plans, calculations, clearances, and forms for the local government and, when relevant, the homeowners association. Approval remains subject to each authority's review.

04

Civil Concrete & Structural Civil Works

Construction should follow approved plans, specifications, safety requirements, and a documented inspection and testing plan. Hold points help the owner and professionals verify important work before it is concealed.

05

Architectural Finishing & Turnover

Finishes and building systems are completed according to the agreed scope, followed by testing, a punch list, required records, and turnover. Warranty and correction obligations should be written in the contract.