Building Permit Requirements in the Philippines

Start with your local Office of the Building Official. See what to prepare, how the review works, and what to confirm before moving in.

Building Permit Requirements in the Philippines. Owner checklist covering local requirements, document checklist, inspections.

Quick answer

Start with the Office of the Building Official for the city or municipality where the property is located. Ask for its current checklist for your project type, confirm which professionals and clearances are needed, and secure the applicable permit before starting covered work.

When is a building permit required?

Section 301 of the National Building Code covers construction and other work including alteration, repair, conversion, and demolition. Ask the Building Official how the code, applicable exemptions, and local procedures apply to your specific work before scheduling it. Supreme Court E-Library, Presidential Decree No. 1096.

What should you prepare before applying?

  1. Project details. Share the exact property location, proposed use, floor area, and type of work, including any addition or demolition.
  2. Property and authority documents. Ask what proof of ownership or authority to build the office accepts for your situation.
  3. Plans and forms. Ask for the required drawing disciplines, forms, signatures, seals, copies, and digital files. Coordinate the set with the licensed professionals preparing it.
  4. Clearances and assessments. Confirm which zoning, fire safety, utility, subdivision, or other approvals apply. Ask which come before filing and which are processed with the application.

How does the review work?

Ask how to file, pay official fees, track the application, and respond to corrections. Assign one person to keep the submission log. Record the drawing revision and date sent so a corrected sheet reaches every reviewer and the contractor. Quezon City’s online process shows how one LGU handles its forms and appointments. Use your own LGU’s current checklist for your project. Quezon City building permit application guide.

Can you move in when construction ends?

Confirm the applicable certificate of occupancy, inspection, and closeout requirements with your Building Official before occupation. Agree early on who will prepare as-built drawings or completion documents when required, schedule inspections, and keep the official records.

Use the homeowner’s checklist to track permits and site milestones, and include permit fees and professional services in your construction budget. Ask each licensed contractor you shortlist who will coordinate filings and inspections.