House Construction Checklist for Philippine Homeowners
Use a checklist for drawings, permits, contract scope, progress payments, inspections, and turnover before you start building.
Quick answer
Before work starts, confirm the project drawings, applicable permits, written scope, payment milestones, inspection responsibilities, and how changes will be approved. Keep the current documents where both you and the site supervisor can find them.
Before requesting bids
- Confirm the property boundaries, location, intended floor area, and site access.
- Prepare dated drawings and a finish schedule that describes the same work for every bidder.
- List owner-supplied items, separate costs, and the expected completion or turnover date.
- Compare quotes line by line. Use the PCAB-verified contractor shortlist to check licenses and ask for comparable project references.
Before mobilization
- Confirm the applicable permits and keep copies of the approved drawings on site.
- Sign an agreement with scope, exclusions, taxes, payment milestones, written variation procedure, and warranty.
- Agree who will organize temporary power and water, secure the perimeter, handle deliveries, and protect neighboring property.
- Record existing conditions with dated photos and agree how inspections and progress reports will be documented.
During construction
Keep a decision log with the date, work affected, cost, schedule effect, and person who approved it. Agree with the design team when inspections are needed before important work is covered. Ask the contractor to show completed work and supporting records against each milestone before a payment is released.
Before handover
Walk through the house with the responsible team. Record unfinished or defective items, who will fix each one, and the agreed deadline. Collect keys, warranties, manuals, receipts, and any completion or occupancy documents required for the project. Keep a copy of signed acceptance records.
Use the permit guide and site fencing guide before setting a start date. For a reference on private contract terms, see CIAP Document 102.