House Construction Contract Checklist Before You Sign

Plan with practical checks for parties and authority, scope attachments, and price and progress. Includes an owner review checklist.

House Construction Contract Checklist Before You Sign. Planning checklist for parties and authority, scope attachments, price and progress.

What should a house construction contract describe?

Identify the contracting parties, drawings, included work, price and payments, schedule, change procedure, and turnover requirements. Resolve differences between the contract, quotation, and drawings before signing.

Start with the project conditions

A family has approved the floor plan and agreed on a budget in a meeting. The contractor sends a short agreement with no drawing list. Build a signing packet with the proposal, dated plans, specification, and payment schedule so the written scope can be checked as a whole.

Example of a contract document index

For a two-storey house, list the signed agreement first, then the itemized quotation, the architectural and service drawings, the finish schedule, the milestone table, and any signed clarifications. Each row should have a version or date and the party that issued it. Attach or link each document so it can be found during a claim or change.

Before signing, pick one item such as exterior paving and trace it through the documents. Check its location, finish, quantity, price, and completion condition. If the plans show paving but the quote excludes it, ask the parties to resolve the scope and keep their signed clarification in the index.

What to check before you proceed

Parties and authority

Check the firm’s exact name against the proposal and relevant license record. Ask who has authority to sign, issue instructions, and receive notices. Record an address and agreed channel for project correspondence in the contract packet.

Scope attachments

Attach the dated drawings, material schedule, pricing breakdown, and exclusions. Read them for conflicts about finishes and services. Ask the parties to state how they will resolve contradictions before work starts, especially if a later sketch changes an earlier item.

Price and progress

Trace each milestone to physical work and the documents required for review. Ask how allowances become actual costs, who approves extra work, and when disputed amounts can be resolved. Check that the amounts add to the stated price.

Turnover and repairs

List inspections, final records, warranties, keys, and the process for making and closing a punch list. Ask which contractor contact handles a repair after the handover and where service notices should be sent.

What to keep in your project file

Save one dated proposal alongside the drawings and finish schedule it refers to. Ask each bidder to use that same reference and show any allowance, excluded item, or unresolved price in writing.

Owner review checklist
Check Keep a copy of Resolve before proceeding
Parties and authority Full legal names and signed authority where needed. The proposal and agreement name different firms.
Scope attachments Complete drawing and specification register. Important attachments are unsigned, missing, or undated.
Price and progress Agreed milestone values and change form. Amounts or proof required for claims remain unclear.
Turnover and repairs Turnover deliverable list and repair contacts. The agreement has a payment deadline with no handover requirements.

How to make the decision

Read the price schedule while following the drawing list. Mark each excluded work item and identify who will arrange it. Take unclear wording to the project team and get contract advice when payment, delay, termination, or liability terms need interpretation.

Does a quotation become the whole contract?

Check the signed agreement for the documents it incorporates. Ask it to identify each referenced quotation, drawing, schedule, and written clarification by date so everyone can locate the same set.

Related guides

Reference CIAP Document 102 on private construction.